Jesco Products
 
News

Search in News

 

News

Meghalaya Power Generation Corporation's Umngot Hydel Project

  8-Feb-2016
   
 

Meghalaya Energy Corporation is planning to set up Umngot H.E. Project on the river Umngot, a south flowing river which flows into Bangladesh. The project consists of a 111 metres high concrete dam with a length of 362 metres across river Umngot to impound 71.31 MCum. of water. An Intake will lead the water from the reservoir to a 3.40m diameter head race tunnel of length 5.646 Km and a 2.5m diameter steel lined pressure shaft of length 2.119 Km will then carry the water to three Pelton turbines of 70 MW capacity each in a surface Power House of length 107.5m and width 22m for generation of 210 MW of peak power. As of January 2016, environment clearance for the project is underway.

 
Jesco Projects (India) Pvt. Ltd.
7, Maskati Mahal, 2nd Floor, 119 K. M. Sharma Marg,
Mumbai 400-002, India.
Tel: +91-22-22083558 / 22013804 / 22006388
Fax: +91-22-22062247
Email: contact(at)jescoindia.com
 
Home .
About Us
Projects
Products .
Services & Solutions
E-Catalogues
News .
Opportunities
Careers
Contact Us .
Sitemap
 
       Â© Copyright. Jesco Projects (India) Pvt. Ltd. All Rights Reserved.